Texas School for the Deaf
|
|
Main Campus Additions
Construction of four (4) new buildings, renovation of seven (7) existing buildings, associated with the utilities, paving, parking and drainage improvements. Upgraded the entire water and wastewater system within the approximately 80 acres campus.
Sidewalk Improvements
The existing sidewalk abutting the Texas School for the Deaf does not meet Americans With Disabilities Act Accessibility Guidelines (ADAAG). In addition, a portion of the retaining wall supporting the embankment adjacent to the sidewalk collapsed during a storm event. The proposed improvements include the construction of approximately 1,400 linear feet of new sidewalk and serpentine segmental retaining wall, a bus stop, tree planting, curb / gutter and the associated utility adjustments.
|
|
Austin Independent School District
|
|
|
Nan Clayton Elementary School - Austin, Texas
New school with a 91,960 sq. ft. building, access and circulation drives, parking, sidewalks, plays cape and play field areas, and water quality improvements.
Completion Date: 2006 Construction Cost: $12.5 Million
|
|
|
Overton Elementary School - Austin, Texas
Development consists of a new elementary school and a new recreation center with the associated roadway, parking, driveway, water, wastewater and drainage improvements.
Completion Date: 2008
Awarded: United States Green Building Council Balcones Chapter 2009 Green School Award
|
|
|
Timy Baranoff Elementary School - Austin, Texas
New school with an approx. 60,000 sq. ft. building, a playing field, jogging trail, playgrounds, and 90 parking spaces.
Completion Date: 1999 Construction Cost: $6.2 Million
|
| Kealing Middle School Addition - Austin, Texas
Renovation of existing main building and construction a new two-story building. Proposed new building will include Library/Media Center and 16 classrooms, including 3 science classrooms/labs.
Completion Date: August, 2007
Awarded: Austin Energy Green Building - 4 Star Rating
|
| Kiker Elementary School - Austin, Texas
Building expansion include the addition of eight classrooms and also the removal of several of the portable buildings.
Completion Date: July, 2007
|
| Crockett High School - Austin, Texas
Existing library expansion. The new building addition consisted of 7,770 sq. ft. with the sidewalk, grading, drainage, water and wastewater improvements.
Completion Date: 1999 Construction Cost: Approx. $1.0 Million
|
| Fulmore Middle School - Austin, Texas
New building for laboratories and classrooms. Site improvements included grading, drainage, detention pond, water and wastewater.
Completion Date: October, 2000 Construction Cost: $1.0 Million
|
Austin Independent School District Small Projects / Site Drainage and Accessibility Improvements:
|
| Akins High School Greenhouse |
Akins High School Fine Arts Bldg |
Akins High School Cafeteria Bldg |
| Allison Elementary School |
Alternative Learning Center |
Andrews Elementary School |
| Barrington Elementary School |
Blackshear Elementary School |
Brooke Elementary School |
| Campbell Elementary School |
Cunningham Elementary School |
Doss Elementary School |
| Future Farmers of America Agricultural Farm |
Hill Elementary School |
Johnston High School |
| Jordan Elementary School |
Kocurek Elementary School |
Murchison Middle School |
| Norman Elementary School |
Oak Hill Elementary School |
Porter Middle School |
| Widen Elementary School |
Zavala Elementary School |
|
|
Del Valle Independent School District
|
| Baty Elementary School - Del Valle, Texas
New elementary school improvements included streets, drainage, two detention ponds, two water quality ponds, site grading, water and wastewater.
Completion Date: 1998 Construction Cost: 7.9 Million
|
University of Texas at Austin
|
|
Whitaker Field at Waller Creek - Austin, Texas
Bank stabilization for three most severely eroded areas along the west bank of Waller Creek within the University of Texas (UT) Whitaker Field property boundary. In addition, RC&A prepared a Master Erosion Plan for the Waller Creek along Whitaker Field. This stretch of Waller Creek spans from 47th Street at the downstream end to 51st Street at the upstream end in Austin, Texas. It consists of approx. 1,800 feet of stream length.
Completion Date: On-Going Construction Cost: Phase 1 - $380,000 Phase 2 - $1 Million (estimated)
|
|
University of Texas at Austin Thermal Energy Storage Facility
The project site is located off the southeast corner of Dean Keeton Blvd. and San Jacinto Street, behind the Simkins Dormitory and consisted of approximately 1.2 acres. The area is currently occupied by an asphalt parking lot and some greenspace between the parking lot and the back of Simkins Dormitory. The site plan included a pump station located within a portion of the ground floor of the San Jacinto parking garage, a 105-foot diameter tank (sitting on a 109-foot diameter foundation), and the associated parking, driveway, drainage and utility improvements. The height of the tank approximates the height of the parking garage.
|
University of Texas Library Storage Building Addition
Add approximately 55,000 square feet of new storage area for the existing UT Library Storage Building in the J.J. Pickle Research Center in Austin.
| T.S. Painter Hall Wastewater Line Improvements
Wastewater line improvements from Painter Hall building to an existing manhole located on West 24th Street. The proposed wastewater line improvements consist of approximately 80 lineal feet.
|
|