Schools / Universities

Texas School for the Deaf (Main Campus Additions and Sidewalk Improvements):

 

Construction of four (4) new buildings, renovation of seven (7) existing buildings, associated with the utilities, paving, parking and drainage improvements.  Upgraded the entire water and wastewater system within the approximately 80 acres campus.

 

Completion Date:  2004

Construction Cost: Approximately $32 Million

 

 

Austin Independent School District

       New Schools and Expansions:

Timy Baranoff Elementary School

 

New school with an approx. 60,000 sq. ft. building, a playing field, jogging trail, playgrounds, and 90 parking spaces.

 

Completion Date:  1999

Construction Cost:  $6.2 Million

Fulmore Middle School, Austin ISD

 

New building for laboratories and classrooms. 

Site improvements included grading, drainage,

detention pond, water and wastewater.

 

Completion Date:  October, 2000  

Construction Cost:  $1.0 Million

Nan Clayton Elementary School

 

New school with a 91,960 sq. ft. building,  access and circulation drives, parking, sidewalks, plays cape and play field areas, and water quality improvements.

 

Completion Date:  2006

Construction Cost:  $12.5 Million

Overton Elementary School

 

Development consists of a new elementary school and a new recreation center with the associated roadway, parking, driveway, water, wastewater and drainage improvements.

 

Completion Date:  On-Going

Kiker Elementary School

 

 Building expansion include the addition of eight classrooms and also the removal of several of the portable buildings.

 

Completion Date:  On-Going

Kealing Middle School

 

 Renovation of existing main building and construction a new two-story building.  Proposed new building will include Library/Media Center and 16 classrooms, including 3 science classrooms/labs.

 

Completion Date:  On-Going

 

Crockett High School

 

Existing library expansion.  The new building addition consisted of 7,770 sq. ft. with the sidewalk, grading, drainage, water and wastewater improvements. 

 

Completion Date: 1999 

Construction Cost:  Approx. $1.0 Million

   

      Small Projects / Site Drainage and Accessibility Improvements:

Akins High School Greenhouse

Akins High School Fine Arts Building Akins High School Cafeteria Building Alternative Learning Center
Blackshear Elementary School Campbell Elementary School

Cunningham Elementary School

Future Farmers of America Agricultural Farm
Hill Elementary School Johnston High School Jordan Elementary School Kocurek Elementary School
Murchison Middle School Norman Elementary School Oak Hill Elementary School Porter Middle School
Widen Elementary School Zavala Elementary School    

                                             

Del Valle Independent School District

Baty Elementary School

 

New elementary school improvements included streets, drainage, two detention ponds, two water quality ponds, site grading, water and wastewater.

 

Completion Date: 1998 

Construction Cost: 7.9 Million

 

 

University of Texas at Austin

      Site / Drainage Improvements:

Whitaker Field at Waller Creek

Bank stabilization for three most severely eroded areas along the west bank of Waller Creek within the University of Texas (UT) Whitaker Field property boundary.  In addition, RC&A prepared a Master Erosion Plan for the Waller Creek along Whitaker Field.  This stretch of Waller Creek spans from 47th Street at the downstream end to 51st Street at the upstream end in Austin, Texas.  It consists of approximately 1,800 feet of stream length.

Completion Date: On-Going

Construction Cost: Phase 1 - $380,000,  

                                       Phase 2 - $1 Million (estimated)

 

University of Texas Library Storage Building Addition

Add approximately 55,000 square feet of new storage area for the existing UT Library Storage Building in the J.J. Pickle Research Center in Austin.

T.S. Painter Hall Wastewater Line Improvements

Wastewater line improvements from Painter Hall building to an existing manhole located on West 24th Street.  The proposed wastewater line improvements consist of approximately 80 lineal feet.

 